RENO, NV · EV CHARGING

Commercial EV charging installation in Reno.

We plan and install EV charging for Reno offices, retail sites, dealerships, fleet yards, and other commercial buildings.

Chargers that show up on time.

The hard part of EV charging installation isn't the charger, it's the power: service capacity, panel upgrades, trenching, and utility make-ready programs that can cover a surprising share of the cost. Good designs start from your electrical reality, not a brochure.

Good fleet charging plans start from routes and dwell times so vehicles are charged when they roll, and workplace charging gets managed loads so your demand charges don't eat the benefit. Broken chargers kill adoption, so service is part of every proposal.

Price my chargers

START HERE

What does a Reno business need for EV charger installation?

Commercial EV charging installation in Reno starts with the charging goal, parking layout, and available electrical service. Level 2 chargers can fit tenant or employee parking. DC fast chargers fit sites where drivers need a quick turn. We match the charger to the use of the building. We also check panel capacity, charger access, and the path for new electrical equipment. A DC fast charger may need 480V three-phase service and utility upgrades. If the site cannot support the needed power, the plan must change before installation.

Confirm the permit path before final design

A Reno address does not always settle which building office handles the project. Confirm whether the site falls under the City of Reno or the Washoe County Building Program. That choice changes where the permit package goes. For City projects, accepted applications can be tracked and paid through the ONE Regional Licensing and Permitting portal. We confirm the permit office before the design is final so the plans follow the right submittal path.

Price my chargers

Charger fit

Which EV charger installation fits a Reno commercial site?

PROJECT PLANNING

How to plan scalable EV charging in Reno

WHAT WE HANDLE

Everything under the EV door.

Site checks

EV charger installation checks for Reno commercial buildings

BEFORE YOU BUY

What records shape a Reno EV charger proposal?

Electrical capacity record

POWER

Provide the panel rating and known building loads. These records show whether added charging load may call for infrastructure upgrades.

Charger schedule

EQUIPMENT

List the charger type, power rating, and port count. This schedule sets the equipment and electrical scope.

Parking plan

LAYOUT

Show the chosen spaces, access lanes, lighting, and charger location. The plan controls placement and the route from power to each unit.

Permit jurisdiction

PERMIT

Confirm City of Reno or Washoe County before submittal. The answer changes the office and permit path used for the project.

Project in Reno?

Tell us the building, exact scope, and target date. Flux will review the request and send the next step.

Price my chargers

QUESTIONS

Straight answers.

Should a Reno commercial building use Level 2 or DC fast chargers?

Use Level 2 when vehicles can remain parked. Consider DC fast charging when rapid turnover is the main operating need.

Can an existing commercial panel support EV chargers?

It depends on panel capacity, building demand, charger rating, and port count. We check those items before setting the electrical scope.

Where is a City of Reno permit application tracked?

After acceptance, the application status and fees can be handled through the ONE Regional Licensing and Permitting portal.

When does utility coordination affect a Reno project?

Utility coordination matters when the charging plan needs a service upgrade. DC fast charging may require 480V three-phase commercial service.

GET STARTED

Put a real number on your chargers.

Free site visit, make-ready money screened, and a price that covers the whole job, not just the hardware.

Price my chargers