EV CHARGING

DC fast charging installation.

High-power charging for fleets and turnover parking, engineered from the utility service down.

THE FAST TIER

When DC fast charging earns its cost

DC fast charging for business is the highway tier: 20 to 60 minutes to a usable battery instead of hours. It is the right tool when drivers stay briefly and need real range: fuel stops, quick-serve retail, fleet depots on tight cycles.

It is also a serious electrical project. Units start around $40,000 and climb past $150,000 with the service work, and many sites need utility upgrades to feed one. The rule that keeps budgets honest: buy speed where dwell time is short, and buy Level 2 everywhere else.

DC fast charging installation at a commercial facility

SIDE BY SIDE

DC fast vs Level 2 for a business site

DC FAST

  • 20-60 minutes to usable range
  • $40k-150k+ per unit installed
  • Often needs utility service upgrades
  • Earns at short-dwell sites: fuel, quick retail, depots
  • Higher demand charges without load planning

LEVEL 2

  • Hours to full - fine for parked cars
  • $2.5k-7k per port installed
  • Runs on building power most sites have
  • Earns at long-dwell sites: offices, multifamily, hotels
  • Modest, predictable operating cost

POWER PLANNING

DC fast charger power requirements

One DC fast unit can draw as much power as a small building. The utility has to see that coming: transformer sizing, service capacity, and sometimes new equipment on their side of the meter.

That conversation takes months, not days, which is why fast-charging projects start with the utility application, not the concrete. Sites that skip that order pay for it in idle hardware.

Price my chargers →

DEMAND CHARGES

Demand charges for DC fast charging

Fast chargers create demand spikes, and commercial power bills price spikes hard. A site that manages when and how fast sessions run keeps the bill sane. Some pair a battery with the charger to shave the spike.

This is design work, not luck. The operating math gets decided before installation, in the load plan.

Price my chargers →

Does fast charging fit your site?

Request an estimate. You'll get an honest read on utility capacity, cost, and whether Level 2 serves your drivers better.

Price my chargers

QUESTIONS

Straight answers.

How fast is DC fast charging really?

Most drivers get to a usable battery in 20 to 60 minutes, depending on the unit's power and the car's limits.

Why do fast chargers cost so much to install?

The hardware is industrial-grade, and the electrical service behind it often needs utility upgrades. The service work regularly costs as much as the charger.

Can any site get DC fast charging?

Not economically. Utility capacity decides. Some sites connect cheaply; others would need transformer and service work that only heavy usage justifies.

Do fast chargers make money?

At the right site, yes: short-dwell locations with steady traffic. At long-dwell sites, Level 2 usually earns better because it costs a tenth as much.

GET STARTED

Ready to price your chargers?

Request an estimate. Utility capacity checked, both tiers priced, no guessing.

Price my chargers