


COMMERCIAL ENERGY · AUTOMATION · FACILITY SERVICES
Commercial contractors in Montgomery.
We plan and manage commercial building projects in Montgomery, from repairs and alterations to occupancy changes and demolition.
WHAT WE DO
From energy audits to robot repair.
Energy
Find the waste, fund the fix.
Energy audits
Audit cost & pricing
Efficiency consultants
ALL ENERGY →
Battery
Storage that pays for itself.
BESS installation
Battery backup
Containerized BESS
ALL BATTERY →
EV
Charging that shows up on time.
EV charging installation
Fleet charging
Workplace charging
ALL EV →
Robots
Automation that earns its floor space.
Cleaning robots
Autonomous floor scrubbers
Security robots
ALL ROBOTS →
Mechanical
The big installs, built right.
HVAC installation & replacement
Ductwork installation
Sheet metal & pipe fabrication
ALL MECHANICAL →
Maintenance
The trades that keep buildings alive.
HVAC service
Electricians
Roofing
ALL MAINTENANCE →
Not sure where it fits?
Reach out. We scope it and put the right team on it, whatever the trade.
MONTGOMERY BY THE NUMBERS
What Montgomery does to buildings.
SUMMER
IS THE STRESS TEST
Cooling season is when undersized equipment shows itself.
195K
PEOPLE STRONG
Montgomery commercial buildings keep a growing market running.
START HERE
How do you choose commercial contractors in Montgomery?
Choose Commercial contractors by matching the firm to the exact building change, permit path, and project records. In Montgomery, construction, enlargement, alteration, demolition, repair, occupancy changes, and signs may call for an application. That decision can change the scope and schedule. We define the building change before work begins. We also confirm whether city or state rules govern the job. Montgomery lists the 2024 International Building Code, while Alabama’s Division of Construction Management lists the 2021 code with later amendments for projects under its authority.
Scope Check
What should Montgomery commercial contractors confirm before work starts?
- Name the building action: construction, enlargement, alteration, demolition, repair, occupancy change, or sign work. The action determines which application may apply.
- Check whether the job needs a Building Permit Application or Sign Permit Application. That choice changes the permit record and review path.
- Record the building use before and after the project. A change of occupancy can trigger a permit decision.
- Identify the authority reviewing the project. City review points to Montgomery’s adopted rules; qualifying state work may follow the Alabama Division of Construction Management code.
Bid Records
What belongs in a Montgomery commercial contractor scope?
Project documents
Scope
List the drawings and job specifications used for the bid. Project-specific documents keep the price tied to the actual building need.
Code record
Pass/Fail
Name the adopted code and reviewing authority. A bid that does not identify the code path is a poor fit because its scope cannot be checked against the correct standard.
Permit record
Permit
State whether the project involves repair, alteration, demolition, occupancy change, or sign work. That condition changes the application path in Montgomery.
Specification format
Documents
Use CSI MasterFormat numbering when the owner’s project standards call for it. The cited guidance says its sections are a guide for creating project specifications, not the project specification itself.

POWER & AUTOMATION
Battery storage, EV charging, and robots that work.
Commercial buildings are adding batteries, chargers, and floor robots faster than most contractors can keep up. We design and install battery energy storage systems, handle utility interconnection, and build EV charging from a pair of stalls to a full fleet depot.
On the automation side, we deploy cleaning and security robots that pay for themselves in labor, then keep every piece of it running. Planning any of this? Get in touch and get a real number for your building.
Get in touchHOW IT WORKS
From first call to finished work.

01
Get in touch
Tell us the building and the problem. Two minutes, no phone tag.

02
Get a scoped proposal
We assess the site, engineer the fix, and put a real price on it.

03
The work gets done
Vetted, insured local crews, with one point of contact from scope to done.
WHY FLUX
One call covers the whole building.
Every trade, one contact
Mechanical, electrical, energy, robots. You deal with one person from scope to done.
Licensed local crews
Insured crews from your market, vetted before they walk your site.
A real price, fast
Free site visit, scoped proposal, and a number you can take to your board.
Built for what's next
Battery storage, EV charging, and facility robots alongside the trades you already buy.

THE CORE TRADES
The trades that keep a building running.
HVAC, plumbing, electrical, roofing. The unglamorous work is most of the job, and slow contractors are where it costs you. Our mechanical crews handle installs and replacements, from rooftop units to boilers, chillers, and process piping.
Maintenance covers the rest: service calls, electricians, roofing, fire and life safety, landscaping, and snow. Not sure where to start? An energy audit finds the waste and funds the fix.
Get in touchWHO WE SERVE
Every kind of commercial building.
Office & corporate
Tenant comfort, uptime, and energy costs under control.
Industrial & manufacturing
Process piping, automation, and the power to run it.
Warehouse & logistics
Docks, floors, charging, and robots that earn their space.
Retail & hospitality
Fast fixes and clean installs that never touch open hours.
Healthcare & medical
Code-first work in buildings that can't go down.
Multifamily & HOA
One contact for the whole property, every trade.
POPULAR PROJECTS
What we get asked for most.
QUESTIONS
Straight answers.
When may a Montgomery commercial building need a permit application?
Montgomery says an application should be submitted when a project will construct, move, enlarge, alter, demolish, repair, change occupancy, or erect a sign.
Which building code does Montgomery list?
The city’s Building Inspections page lists an ordinance adopting and amending the 2024 International Building Code. We confirm the code path before setting the project scope.
Can state rules affect a commercial project in Montgomery?
Yes, when the Alabama Division of Construction Management has authority. It lists the 2021 International Building Code with stated exceptions and later amendments.
What should we receive before comparing commercial contractor bids?
Use the same project-specific drawings, specifications, building-use record, permit decision, and code authority for each bid. Exclude a bid that leaves those scope controls unclear.
GET STARTED
One call away.
Tell us the building and the problem. We bring the plan, the price, and the crew. Site visits are free, always.