


COMMERCIAL ENERGY · AUTOMATION · FACILITY SERVICES
Commercial contractors in Madison.
We plan and manage commercial building projects in Madison, from scope and trade needs to permits, site access, and closeout records.
WHAT WE DO
From energy audits to robot repair.
Energy
Find the waste, fund the fix.
Energy audits
Audit cost & pricing
Efficiency consultants
ALL ENERGY →
Battery
Storage that pays for itself.
BESS installation
Battery backup
Containerized BESS
ALL BATTERY →
EV
Charging that shows up on time.
EV charging installation
Fleet charging
Workplace charging
ALL EV →
Robots
Automation that earns its floor space.
Cleaning robots
Autonomous floor scrubbers
Security robots
ALL ROBOTS →
Mechanical
The big installs, built right.
HVAC installation & replacement
Ductwork installation
Sheet metal & pipe fabrication
ALL MECHANICAL →
Maintenance
The trades that keep buildings alive.
HVAC service
Electricians
Roofing
ALL MAINTENANCE →
Not sure where it fits?
Reach out. We scope it and put the right team on it, whatever the trade.
MADISON BY THE NUMBERS
What Madison does to buildings.
HAIL
COUNTRY
Roofs here get inspected after every serious season.
SUMMER
IS THE STRESS TEST
Cooling season is when undersized equipment shows itself.
286K
PEOPLE STRONG
Madison commercial buildings keep a growing market running.
START HERE
How to choose Commercial contractors in Madison
Start with the project scope, permit path, and trade needs. Madison says some projects need a permit. Others may need a separate approval. We check the city permit chart before the budget and schedule are set. This can change filing tasks, lead times, and who must join the job. Fire or conveyance work needs a closer code check. Madison lists MGO 34 for fire protection and MGO 40 for conveyances. We use the rule tied to the project, then set the needed plans, trade roles, and records. A contractor is a poor fit if its bid leaves those duties unclear.
Bid Fit Checks
What to check in Madison commercial contractor bids
- Scope match: Compare each bid with the project plans and project-specific specifications. A gap changes the price, trade list, or schedule.
- Specification format: Check whether the bid follows the named CSI MasterFormat sections used in the project documents. A mismatch can hide missing work.
- Permit duty: Name who checks the Madison permit chart, files each permit, and tracks other approvals. An unnamed owner is a fail.
- Code scope: Mark any fire protection work under MGO 34 and any conveyance work under MGO 40. Those conditions change the plans and trade review.
Site Control
How Madison businesses can control an active commercial jobsite
Worker entry record
Access
Choose cards or mobile credentials for workers. The choice changes how people enter and how lost access is removed.
Subcontractor end date
Control
Set time-limited credentials to expire when each subcontractor leaves the job. This changes the offboarding record and cuts old access.
Access event log
Record
Require a timestamped, exportable log when the project needs an audit trail. If the system cannot export events, it fails that need.
Multi-site control
Fit
For work at more than one commercial site, decide if managers need one cloud dashboard. That choice changes server needs and key handling.

POWER & AUTOMATION
Battery storage, EV charging, and robots that work.
Commercial buildings are adding batteries, chargers, and floor robots faster than most contractors can keep up. We design and install battery energy storage systems, handle utility interconnection, and build EV charging from a pair of stalls to a full fleet depot.
On the automation side, we deploy cleaning and security robots that pay for themselves in labor, then keep every piece of it running. Planning any of this? Get in touch and get a real number for your building.
Get in touchHOW IT WORKS
From first call to finished work.

01
Get in touch
Tell us the building and the problem. Two minutes, no phone tag.

02
Get a scoped proposal
We assess the site, engineer the fix, and put a real price on it.

03
The work gets done
Vetted, insured local crews, with one point of contact from scope to done.
WHY FLUX
One call covers the whole building.
Every trade, one contact
Mechanical, electrical, energy, robots. You deal with one person from scope to done.
Licensed local crews
Insured crews from your market, vetted before they walk your site.
A real price, fast
Free site visit, scoped proposal, and a number you can take to your board.
Built for what's next
Battery storage, EV charging, and facility robots alongside the trades you already buy.

THE CORE TRADES
The trades that keep a building running.
HVAC, plumbing, electrical, roofing. The unglamorous work is most of the job, and slow contractors are where it costs you. Our mechanical crews handle installs and replacements, from rooftop units to boilers, chillers, and process piping.
Maintenance covers the rest: service calls, electricians, roofing, fire and life safety, landscaping, and snow. Not sure where to start? An energy audit finds the waste and funds the fix.
Get in touchWHO WE SERVE
Every kind of commercial building.
Office & corporate
Tenant comfort, uptime, and energy costs under control.
Industrial & manufacturing
Process piping, automation, and the power to run it.
Warehouse & logistics
Docks, floors, charging, and robots that earn their space.
Retail & hospitality
Fast fixes and clean installs that never touch open hours.
Healthcare & medical
Code-first work in buildings that can't go down.
Multifamily & HOA
One contact for the whole property, every trade.
POPULAR PROJECTS
What we get asked for most.
QUESTIONS
Straight answers.
How should a Madison business start a commercial contractor project?
Start with a clear scope and the City of Madison permit chart. The chart helps show whether the project needs a permit or another approval.
What should be written into a Madison commercial bid?
List the plans, project-specific specifications, trade duties, permit owner, schedule, and closeout records. Use the same CSI MasterFormat section numbers when the project documents use that format.
When does a Madison project need a fire or conveyance code check?
Check MGO 34 when the scope includes fire protection. Check MGO 40 when the scope includes a conveyance. The result can change plans, trade roles, and records.
When is cloud access control a good fit for a commercial project?
It fits jobs that need fast credential changes, time-limited subcontractor access, or exportable entry logs. It is a poor fit if the project does not need those controls.
GET STARTED
One call away.
Tell us the building and the problem. We bring the plan, the price, and the crew. Site visits are free, always.