


COMMERCIAL ENERGY · AUTOMATION · FACILITY SERVICES
Commercial contractors in Lubbock.
We plan and coordinate commercial building projects in Lubbock, from scope and trade work to permits, startup, and closeout.
WHAT WE DO
From energy audits to robot repair.
Energy
Find the waste, fund the fix.
Energy audits
Audit cost & pricing
Efficiency consultants
ALL ENERGY →
Battery
Storage that pays for itself.
BESS installation
Battery backup
Containerized BESS
ALL BATTERY →
EV
Charging that shows up on time.
EV charging installation
Fleet charging
Workplace charging
ALL EV →
Robots
Automation that earns its floor space.
Cleaning robots
Autonomous floor scrubbers
Security robots
ALL ROBOTS →
Mechanical
The big installs, built right.
HVAC installation & replacement
Ductwork installation
Sheet metal & pipe fabrication
ALL MECHANICAL →
Maintenance
The trades that keep buildings alive.
HVAC service
Electricians
Roofing
ALL MAINTENANCE →
Not sure where it fits?
Reach out. We scope it and put the right team on it, whatever the trade.
LUBBOCK BY THE NUMBERS
What Lubbock does to buildings.
SUMMER
IS THE STRESS TEST
Cooling season is when undersized equipment shows itself.
273K
PEOPLE STRONG
Lubbock commercial buildings keep a growing market running.
START HERE
What do commercial contractors handle in Lubbock?
The best fit is a firm that can define the building scope, coordinate each trade, manage the permit package, and carry the job through startup and closeout. For mechanical jobs, that may cover HVAC units, ductwork, chilled-water piping, controls, and commissioning. Lubbock requires commercial permit submittals through its online CSS Portal. A complete and correct package can help plan review move faster. We build the schedule around that submittal and ask the City for its current review time before setting key work dates.
Project fit
When should a Lubbock facility use commercial contractors?
- Use Flux when one project joins HVAC equipment, ductwork, piping, controls, and startup. One schedule helps keep those linked tasks in order.
- Use Flux when the permit set must match the building program, code review, and engineering plan. Those records shape the work scope before crews start.
- Use Flux when the facility team needs commissioning records at closeout. The startup results show whether installed mechanical systems pass their planned checks.
- Flux is a poor fit when the job has no defined commercial building scope, site contact, or approval path. We cannot set a sound schedule until those items are clear.
Required records
What records affect contractor planning in Lubbock?
Permit submittal
Before scheduling
The City accepts commercial building applications through the CSS Portal. The online package changes when plan review can start and when field work can be placed on the schedule.
Current review time
Schedule check
City review time changes with work volume. We ask the Senior Plans Examiner for the current timing before we set permit-based start dates.
Accessibility request
Closeout date
When state accessibility review applies, the owner must send a written inspection request to the RAS within 30 calendar days after construction ends. That date goes in the closeout plan.
Accessibility inspection
Pass or fail
When state accessibility review applies, the owner must obtain the RAS inspection no later than the first anniversary of project completion. Missing that limit fails the closeout timing check.

POWER & AUTOMATION
Battery storage, EV charging, and robots that work.
Commercial buildings are adding batteries, chargers, and floor robots faster than most contractors can keep up. We design and install battery energy storage systems, handle utility interconnection, and build EV charging from a pair of stalls to a full fleet depot.
On the automation side, we deploy cleaning and security robots that pay for themselves in labor, then keep every piece of it running. Planning any of this? Get in touch and get a real number for your building.
Get in touchHOW IT WORKS
From first call to finished work.

01
Get in touch
Tell us the building and the problem. Two minutes, no phone tag.

02
Get a scoped proposal
We assess the site, engineer the fix, and put a real price on it.

03
The work gets done
Vetted, insured local crews, with one point of contact from scope to done.
WHY FLUX
One call covers the whole building.
Every trade, one contact
Mechanical, electrical, energy, robots. You deal with one person from scope to done.
Licensed local crews
Insured crews from your market, vetted before they walk your site.
A real price, fast
Free site visit, scoped proposal, and a number you can take to your board.
Built for what's next
Battery storage, EV charging, and facility robots alongside the trades you already buy.

THE CORE TRADES
The trades that keep a building running.
HVAC, plumbing, electrical, roofing. The unglamorous work is most of the job, and slow contractors are where it costs you. Our mechanical crews handle installs and replacements, from rooftop units to boilers, chillers, and process piping.
Maintenance covers the rest: service calls, electricians, roofing, fire and life safety, landscaping, and snow. Not sure where to start? An energy audit finds the waste and funds the fix.
Get in touchWHO WE SERVE
Every kind of commercial building.
Office & corporate
Tenant comfort, uptime, and energy costs under control.
Industrial & manufacturing
Process piping, automation, and the power to run it.
Warehouse & logistics
Docks, floors, charging, and robots that earn their space.
Retail & hospitality
Fast fixes and clean installs that never touch open hours.
Healthcare & medical
Code-first work in buildings that can't go down.
Multifamily & HOA
One contact for the whole property, every trade.
POPULAR PROJECTS
What we get asked for most.
QUESTIONS
Straight answers.
What can Flux coordinate for a Lubbock commercial building?
We can coordinate project scope, trade schedules, permit records, installation steps, startup, and closeout. Mechanical scope may include HVAC, ductwork, chilled-water piping, and building controls.
How does the Lubbock permit process affect the start date?
The City requires online filing through its CSS Portal. A complete package must be ready before plan review can move forward, and current review time should be checked before key work dates are set.
What should a Lubbock facility define before hiring commercial contractors?
Define the building program, trade scope, engineering needs, permit path, site contact, and closeout records. Each item changes the schedule or who must take part.
What closeout date may apply to accessibility inspection?
When state accessibility review applies, the owner must request inspection in writing within 30 calendar days after completion and obtain the inspection by the first anniversary of completion.
GET STARTED
One call away.
Tell us the building and the problem. We bring the plan, the price, and the crew. Site visits are free, always.